Azrar: Aterian Extends Its Amane Copper Target to 2.5 Kilometers in the Anti-Atlas

Aterian, a British mining explorer listed in London, announced on October 14 that the first fieldwork at its Azrar copper-silver project, in the western Anti-Atlas, has widened the known footprint of the mineralization.

AI-generated concept image: a green crust of malachite fills the cracks of reddish-brown sandstone on an arid hillside.
Malachite in the cracks of red sandstone. AI-generated concept image.

Only four of the twenty-two planned mapping traverses were enough to locate copper showings over an apparent length of 1.6 kilometers within the Amane target, now 2.5 kilometers long.

Geologists also found old mine workings associated with visible copper, as well as previously unknown mineralization at the Tifrit target.

Aterian holds 85% of the project, whose exploration is fully funded by its artificial intelligence joint venture with Lithosquare. Scout drilling is planned for the fourth quarter of 2026.

Until then these are surface observations only, and the drill core will tell what Azrar is worth.

Photo: Marek Slusarczyk (Tupungato), CC BY 3.0.

References:

Aterian plc - Azrar Copper-Silver Project: Field Work Underway